Preparation of carbon steel pipe
The raw material of carbon steel tube is round tube blank. The round tube blank is cut and processed by cutting machine to billet with a length of about 1 meter, and then sent to the furnace by conveyor belt for heating. The billets are fed into a furnace and heated at a temperature of about 1200 degrees Celsius. The fuel is hydrogen or acetylene. The temperature control in the furnace is the key problem. Generally more common puncher is tapered roller puncher, this kind of puncher has high production efficiency, good product quality, large perforation diameter, can wear a variety of steel.
After perforating, the round tube blank is successively rolled, rolled or squeezed by three high. After extrusion, take off the pipe to determine the diameter. The sizing machine rotates the cone bit into the steel blank at high speed to punch holes to form the steel pipe. The inner diameter of the steel pipe is determined by the outer diameter length of the caliper bit. After the steel pipe diameter, into the cooling tower, through water cooling, after the steel pipe cooling, will be straightened.
www.murphyfinnedtubes.com
After straightening, the steel pipe is sent to the metal flaw detector (or hydraulic test) by conveyor belt for internal flaw detection. If there are cracks, bubbles and other problems inside the steel tube, it will be detected. After quality inspection, the steel pipe is selected by hand strictly. After the quality control of the steel pipe, spray with paint the serial number, specification, production batch number, etc. And hoisted into the warehouse by crane
After perforating, the round tube blank is successively rolled, rolled or squeezed by three high. After extrusion, take off the pipe to determine the diameter. The sizing machine rotates the cone bit into the steel blank at high speed to punch holes to form the steel pipe. The inner diameter of the steel pipe is determined by the outer diameter length of the caliper bit. After the steel pipe diameter, into the cooling tower, through water cooling, after the steel pipe cooling, will be straightened.
www.murphyfinnedtubes.com
After straightening, the steel pipe is sent to the metal flaw detector (or hydraulic test) by conveyor belt for internal flaw detection. If there are cracks, bubbles and other problems inside the steel tube, it will be detected. After quality inspection, the steel pipe is selected by hand strictly. After the quality control of the steel pipe, spray with paint the serial number, specification, production batch number, etc. And hoisted into the warehouse by crane
评论
发表评论